Monday: We started framing the non-load bearing partition walls for the first floor.
Tuesday: We resumed the framing, and we are now almost done with it.
Wednesday: We started work on the staircase, we decided that it would have a total of 17 steps at 7 3/8" high and 10 1/2" depth. we got the stair stringers marked out, and one finished.
Friday: We finished work on the staircase by cutting and installing the plywood on it.