Monday: we got a short wall built near the stairs, as well as a small linen closet attached to the bathroom.
Thursday: Inspected the interior framing job for anything that could cause the drywall not to fit right. This included checking the walls for their uniformity, plumbness, adding backing where needed, and making sure transitions between studs/plates were flush.
Friday: Started fixing all of the small details that we noticed earlier.
No comments:
Post a Comment