Thursday, January 13, 2011

So, this is our first full week back from break with a full class ready to work. The roof is all sealed off so now its time to focus on making sure the interior framing, minus the stairs for now, is properly done, wrapping the house in Tyvek, make the window and door bucks, install the windows, then finally get our 4" of insulation up on the exterior of the home. Lots of works still ahead in cold, windy SE conditions!
Placing last bathroom wall on the second floor
Cutting and ripping window bucks to 10 3/4" so that they will be flush with siding
Placing backing for eventual drywall

Nailing the bathroom walls together once plumb

Placing Tyvek
Cutting out the door framing

First course of Tyvek up with the windows and doors cut out