Thursday, February 10, 2011
This week we were able to finish off the stairs, frame a wall under the stairs, put up and tape off most of the Tyvek, re-frame the kitchen, block the kitchen, staircase, and bathrooms, and put the final touches to the interior rough framing. The plumbers are expected to start rough plumbing the house today so its time for the class to migrate outside of our wonderful dry fit home to the sleet and rain once again. Installing 4" of pink foam insulation to the outside of the home is our next major undertaking.
Showcasing the home to local elected officials
Doing "the math" for the staircase
Using a framing square to outlay the stair stringer
Working on the laying out the second of three stair stringers
Cutting out the stair stringers
First stringer in with a 2x4 spacer for drywall
Shingles on the roof awaiting installation
Temporary staircase in
New open bar layout for the kitchen
Extra storage access under the stairs
Making the final touches to the rough framing
Putting up the last course of Tyvek to the eve
Insulation arrives!
Cutting out fiberglass insulation for the cantilevers