The first floor joists and subfloor have been built. The site is now being worked on to provide perimeter footing drain and backfill, along with rough in utilities to crawl space. The adjacent lot is also being prepared, making the delivery of the job trailer soon, which will provide storage for equipment and tools.
While the site is being wrapped up, students are busy cutting wall parts in the high school wood shop that are necessary to frame the first floor walls.