We are back at the project after our Thanksgiving Break. Conditions have deteriorated for construction. It is our hope to true up exterior 2nd floor walls and install roof trusses soon. The snow is definately slowing progress. Students are dressing for the weather and have a great attitude.
No comments:
Post a Comment