Class painting concrete board siding
A make-shift drying rack in class for siding. Needs to dry for at least 3 days
Deck blocking equipped with Stratton bracket.
Sheet metal foundation flashing with first course of pink foam and bug net.
Rough plumbing underway in crawl space
Second floor bathroom rough plumbed with a hole cut out for the bath tub.
Future site for plumbing air vent
nice neat work
ReplyDelete