Putting up South side roof
South side finished including roof
Working on front deck roof
Siding up over the front door
Electrical plug in detail with flashing
Moving dry-wall in a down pour
Installing R-11 fiberglass batts
Installing the ceiling vapor barrier
Vapor barrier sealed with an acoustical sealant, "Black Death"
No comments:
Post a Comment