Thursday, May 12, 2011


Putting up South side roof





South side finished including roof


Working on front deck roof


Siding up over the front door


Electrical plug in detail with flashing


Moving dry-wall in a down pour 



Installing R-11 fiberglass batts


Installing the ceiling vapor barrier 



Vapor barrier sealed with an acoustical sealant, "Black Death"



No comments:

Post a Comment