Monday, April 12, 2010

Pick-Up framing

This week we all worked on the finer details of the interior framing. We inspected the whole inside of the house and started preparing it for drywall and other finishing touches.

Monday: we got a short wall built near the stairs, as well as a small linen closet attached to the bathroom.

Thursday: Inspected the interior framing job for anything that could cause the drywall not to fit right. This included checking the walls for their uniformity, plumbness, adding backing where needed, and making sure transitions between studs/plates were flush.

Friday: Started fixing all of the small details that we noticed earlier.


No comments:

Post a Comment